preventive maintenance coffee machine 1-Year Visit, only one visit a year

AED 1400.00
شامل ضريبة القيمة المضافة
Inclusive of GST
In stock
**
Delivery Estimation : 1-3 Business Days
Shipping details
Free returns Return Policy link
SKU
preventive-121-235
View All offer
  1. Deep Clean and Descale:

    • Perform a thorough cleaning of all components.
    • Descale the machine using a recommended descaling solution.
    • Run several cycles with clean water to flush out any descaling solution.
  2. Replace Worn Parts:

    • Replace any worn or damaged parts, including gaskets, seals, and filters (note: parts replacement will cost extra).
    • Inspect and replace the group head seal if necessary (note: parts replacement will cost extra).
  3. Calibrate Machine:

    • Check the machine’s temperature and pressure settings.
    • Calibrate as needed to ensure consistent performance.
  4. Inspect Boiler and Heating Elements:

    • Check the boiler and heating elements for any signs of damage or wear.
    • Ensure they are heating efficiently and evenly.
  5. Lubricate and Adjust Mechanisms:

    • Lubricate all moving parts, including the lever mechanism.
    • Adjust any mechanical components to ensure smooth operation.
  6. Test and Document Performance:

    • Run multiple test brews to check for consistent extraction and quality.
    • Document any issues and their resolutions.
  7. Check for Software Updates:

    • If the machine has any programmable components, check for software or firmware updates.
    • Install updates as necessary.
  8. Comprehensive Electrical Check:

    • Conduct a detailed inspection of all electrical components.
    • Ensure the machine is safe and meets all electrical standards.

Documentation:

  • Service Log: Maintain a detailed log of all maintenance activities, including the date, tasks performed, parts replaced, and any issues found.
  • Feedback and Improvement: Gather feedback from users about the machine’s performance and address any recurring issues.

Note: Any parts replacement will incur additional costs.

More Information

Specifications
Manufacturer Nuova Simonelli

Reviews

Write Your Own Review
You're reviewing:preventive maintenance coffee machine 1-Year Visit, only one visit a year
Your Rating
Search engine powered by ElasticSuite