Preventive maintenance coffee machine 6-Month Visit, 2 Visits in a year

AED 1000.00
شامل ضريبة القيمة المضافة
Inclusive of GST
In stock
**
Delivery Estimation : 1-3 Business Days
Shipping details
Free returns Return Policy link
SKU
Preventive-121-121
View All offer
  • Tasks:

  • Clean the Machine:

    • Perform a thorough cleaning of all components.
    • Run several cycles with clean water to ensure internal cleanliness.
  • Replace Worn Parts:

    • Replace any worn or damaged parts, including gaskets, seals, and filters. (note: parts replacement will cost extra)
    • Inspect and replace the group head seal if necessary.
  • Calibrate Machine:

    • Check the machine’s temperature and pressure settings.
    • Calibrate as needed to ensure consistent performance.
  • Inspect Boiler and Heating Elements:

    • Check the boiler and heating elements for any signs of damage or wear.
    • Ensure they are heating efficiently and evenly.
  • Lubricate and Adjust Mechanisms:

    • Lubricate all moving parts, including the lever mechanism.
    • Adjust any mechanical components to ensure smooth operation.
  • Test and Document Performance:

    • Run multiple test brews to check for consistent extraction and quality.
    • Document any issues and their resolutions.
  • Check for Software Updates:

    • If the machine has any programmable components, check for software or firmware updates.
    • Install updates as necessary.
  • Comprehensive Electrical Check:

    • Conduct a detailed inspection of all electrical components.
    • Ensure the machine is safe and meets all electrical standards.
  • Note

More Information

Specifications
Manufacturer Nuova Simonelli

Reviews

Write Your Own Review
You're reviewing:Preventive maintenance coffee machine 6-Month Visit, 2 Visits in a year
Your Rating
Search engine powered by ElasticSuite